Day Thirty-Six
Sweeping for final photos is underway in all grids.
Sweeping in Grid 23/24
Grids 23/24 and 33 have their final photos tomorrow. After photos are taken and blanket elevations done, it will be time for conservation. In Grid 23/24, conservation starts with the construction of a retaining wall (visible in the photograph above) to divert water. The next step is to geotech and sandbag the walls.
Sandbags in Grid 23/24
Grids 92 and 94 are sweeping tomorrow ahead of their final photos on Friday.
Sweeping in Grid 33